Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The following page outlines the steps that are needed to go from Test to Production (Live) for a customer.

The steps are high level steps:

  1. Setup the Production Service Tier / Company
  2. Share a new SOAP URL on the Service Desk
  3. Move Devices in MobiControl
  4. Verify the Production Setup



1. Setup the Producton Service Tier  / Company

The production company/Service tier is setup in the same way as the test company, which means that the install guide can be followed. If you do not have the install guide, go to University to download it.

The following list serves as a minimum checklist for Mobile WMS to work correctly:

  • Users have been added to the list of Mobile Users in the Mobile User Page
  • Users have been added to the Mobile Group (default called Mobile WMS users)
  • The Mobile Language has been added and the Mobile Messages has been created
  • The Users are setup as Warehouse Employees for the locations that they need to work in

2. Share a new SOAP URL on the Service Desk

The devices will be connected to NAV/BC through a web service, therefore you need to find the SOAP URL in the ERP Client and share it such that the configuration in MobiControl can be done by Tasklet Factory.

The steps are the following:

  1. Open the Web Services Page
  2. Find the MOB WS Dispatcher in the list and click on the SOAP URL in order to copy it.
  3. Go to the Tasklet Factory Service Desk and raise a ticket to share the like in order to setup the Production Folder for the customer in question
  4. The Tasklet Factory Employee will do the configuration needed and let you know once the Production folder are ready

3. Move Devices in MobiControl

This process handles the re-configuration of the customers devices such they are connecting to the Production endpoint instead of the Test endpoint.

The steps are the following:

  1. Login to MobiControl with your partner login
  2. Move the device from the Test folder to the Production folder, see also: How to move devices between folders in MobiControl - Support Knowledge Base - Tasklet Factory Docs
  3. Wait untill the device has re-booted
  4. Once the device comes online again it is ready 

4. Verify the Production Setup

Login and verify that the production setup is ready for the customers Go-Live, following the steps below:

  1. Login from a device
  2. Try some of the processes in order to ensure that everything works as planned







  • No labels