Go Live Setup Checklist

The following page outlines the steps that are needed to go from Test to Production (Live) for a customer.

The steps are high-level steps:

  1. Setup the Production Service Tier / Company.
  2. Share a new SOAP URL on the Service Desk.
  3. Move Devices in MobiControl.
  4. Verify the Production Setup.



1. Setup the Production Service Tier  / Company

The production company/Service tier is set up in the same way as the test company, which means that the installation guide can be followed. If you do not have the BC installation guide, the AX and finance installation guide, or go to University to download it.

The following list serves as a minimum checklist for Mobile WMS to work correctly:

  1. Users have been added to the list of Mobile Users on the Mobile User Page.
  2. Users have been added to the Mobile Group (default called Mobile WMS users).
  3. The Mobile Language has been added and the Mobile Messages have been created.
  4. The Users are set up as Warehouse Employees for the locations that they need to work in.

2. Share a new SOAP URL on the Service Desk

The devices will be connected to NAV/BC through a web service, therefore you need to find the SOAP URL in the ERP Client and share it in a ticket, such that the configuration in MobiControl can be done by Tasklet Factory.

The steps are the following:

  1. Open the Web Services Page.
  2. Find the MOB WS Dispatcher in the list and click on the SOAP URL in order to copy it.
  3. Go to the Tasklet Factory Service Desk and raise a ticket to share the link in order to set up the Production Folder for the customer in question.
  4. The Tasklet Factory Employee will do the configuration needed and let you know once the Production folder is ready.

3. Move Devices in MobiControl

This process handles the re-configuration of the customer's devices such they are connecting to the Production endpoint instead of the Test endpoint.

The steps are the following:

  1. Login to MobiControl.
  2. Move the device from the Test folder to the Production folder, see also: How to move devices between folders in MobiControl - Support Knowledge Base - Tasklet Factory Docs.
  3. Wait until the device has re-booted.
  4. Once the device comes online again it is ready.

4. Verify the Production Setup

Log in and verify that the production setup is ready for the customer's Go-Live, following the steps below:

  1. Login from a device.
  2. Try some of the processes in order to ensure that everything works as planned.